PD
Political Dialogue and Cooperation Agreement
PDCA (plan–do–check–act), sometimes called plan–do–check–adjust is an iterative design and management method used in business for the control and continual improvement of processes and products. It is also known as the Shewhart cycle, or the control circle/cycle. Another version of this PDCA cycle is OPDCA. The added O stands for observation or as some versions say: "Observe the current condition." This emphasis on observation and current condition has currency with the literature on lean manufacturing and the Toyota Production System. The PDCA cycle, with Ishikawa's changes, can be traced back to S. Mizuno of the Tokyo Institute of Technology in 1959.
Last 30 days3Stories3Articles0Events
30-day activity pulse
Last 7d articles
3
Prior 7d baseline
0
Trend
new
Peak day
3
Peak article volume on 2026-05-20.
Last 24 hoursStories, events, map, and sources are limited to the past 24 hours. Use the Wikipedia link or the API for deeper history.
Event Timeline
No linked events in the last 24 hours.