CAMEO+ eventINFRASTRUCTURE2026-04-19馃嚨馃嚟

Monterrazas project resumes in Cebu as flood measures improve compliance

source: DENR-EMB 7 -> target: The Mont Property Group Inc.

On 2026-04-19, the DENR-EMB 7 lifted a stoppage order on the Monterrazas hillside project in Cebu City after confirming the developer completed required flood-control corrective measures and settled penalties. Officials said the project resumed with 23 detention ponds in place to reduce runoff and downstream flood risk.

0.14Significance2.0Magnitude0.2Systemic0.1Market1Articles
Location
Cebu CityCentral VisayasSoutheast AsiaPhilippinesAsia10.316, 123.885
Story Links