CAMEO+ eventINFRASTRUCTURE2026-04-21馃嚦馃嚨

Rahughat Hydropower Project reaches 95% physical progress in Nepal

source: Raghuganga Hydropower / Nepal Electricity Authority -> target: Nepal

On 2026-04-21, the 40 MW Rahughat Hydropower Project in Raghuganga Rural Municipality, Nepal, was reported to have reached 95% physical progress. The project had completed major structures including the dam, tunnels, and powerhouse, with one 20 MW unit installed and the second nearing completion as it prepared for test production.

0.24Significance4.0Magnitude0.5Systemic0.3Market1Articles
Location
Raghuganga Rural Municipality (Daghnam, Jhin, Tilkenichaur)Gandaki ProvinceSouth AsiaNepalAsia28.602, 83.543
Story Links